Close Navigation
Search
Hard Rock Hotel 8
Hard Rock Hotel 8

Hard Rock Hotel

The Hard Rock Hotel Project—located in the bustling heart of midtown Manhattan, presented
CARVART with a unique opportunity to showcase its expertise in providing comprehensive
architectural solutions. The goal was to create a visually iconic and structurally sound
installation that captured the essence of the Hard Rock brand while adhering to stringent
budgetary constraints. The project's success hinged on meticulous planning, innovative
materials, and seamless coordination with various trades.

This case study highlights CARVART's role in delivering high-quality finishes, efficient
installations, and sustainable solutions. The scope of work included the design and
installation of key architectural elements such as the dome, column covers, staircases,
railings, elevator lobbies, convector covers, and restroom stalls. The project required
innovative solutions to integrate high-impact design with practical functionality, managing
both the aesthetic expectations and the logistic realities of a major urban construction site.

CLIENT: Excel, Tishman Construction

SCOPE: Full-scope architectural solutions including modular prefabrication,
material engineering, and innovative installation techniques.

left arrow
right arrow

The Hard Rock Hotel dome called for a bold vision and smarter solutions. From ambitious design expectations to strict structural demands, the project required rethinking materials and engineering to achieve a result that was both striking and buildable.

Dome Design Challenge: Architecturally sound, stunning, and sustainable.

Cost-Effective Construction: Sought affordable solutions for dome

construction.

Material Specifications: Initial design specified brass or bronze.

Material Limitations: Brass/Bronze proved too heavy and expensive.

Structural Concerns: Challenges with elevated placement, 30-40 feet high.

To bring the dome concept to life, CARVART reimagined the material and structural strategy. Through smart substitutions and detailed engineering, the team delivered a solution that preserved the original vision while improving feasibility, durability, and visual impact.

Creative Reimagining: Used alternative materials.

Use of Aluminum: Aluminum with metal plating proposed.

Cost-Effectiveness: Brass/bronze look, lower cost.

Reduced Weight: Lighter structure with alternatives.

Longevity and Maintenance: Ensured durability, easier upkeep.

Aesthetic Consideration: Metal plating mimics oxidized look.

Bringing the dome from concept to reality required precision, planning, and global coordination. From CAD modeling to prefabrication in Italy, every step was designed for accuracy, efficiency, and seamless installation on site.

Engineering Precision: Utilized CAD to design, troubleshoot onsite challenges.

Custom Cable Solution: Plated stainless steel cables for design needs.

Engineered Support Slabs: Precisely tensioned to anchor dome securely.

Efficient Prefabrication in Italy: Dome segmented like pizza slices for easy

transport.

Modular Design Philosophy: Ensured seamless installation and structural

integrity.

Carvart Pattern Carvart Pattern
Create an account

In order to save to your artboard or download a pdf you'll nead to Create an account with CARVART or login.